Breach of Contract
Breach of Contract In this conflict, I believe the design professional was responsible for the conflict. This is because the designer was in the know of the equipment that had been settled on. He or she knew was in charge of the design of the ceiling space therefore he knew what dimensions of the equipment, […]
Date: November 16th, 2022